BATTERY START - IF EXTERNAL POWER/APU IS NOT AVAILABLE Accomplish the normal EXTERIOR INSPECTION and COCKPIT PREPARATION procedure to Electrical power……………….ESTABLISH Leave APU GEN switch in the OFF position. Note: Ground air source must be used. Right Hydraulic Electric Pump Switch ........... ON Note: Pack valves, if not closed during previous airplane shutdown, must be closed by ground crew prior to engine start. Isolation Valve Switch...........................ON Position flap lever to agree with flap position.
Park Brake.......................................SET Start one engine using standby engine indicator (SEI). Observe EGT start limit (570° C). Note: The SEI EGT Placard limit reads 850 °C which is the maximum EGT limit for an in-flight start, following a Dual Engine failure. Continue normal PREFLIGHT procedures. |